Protocolo QED-E72A

Etapa A

NO. Items to be Checked OK N/A Punch List
1 Compare nameplate data with drawings and specifications
2 Inspect anchorage, alignment, grounding, and required
3 Verify / Utilized correct app. of manufacturer’s recommended
4 Verify that manual transfer warnings are attached and visible
5 Verify tightness of all control connections
6 Install all bolted electrical connections for high resistance using one or more of the following methods:Ohm meter low resistance ______ Torque
7 Perform manual transfer operation
8 Verify positive mechanical interlocking between normal and alternative sources
9 Clean unit prior to testing unless as-found and as-left test are required

Suba el Protocolo Terminado


Descargar Protocolo a Completar

link

Etapa B

NO. Items to be Checked OK N/A Punch List
1 Compare nameplate data with drawings and specifications
2 Inspect anchorage, alignment, grounding, and required
3 Verify / Utilized correct app. of manufacturer’s recommended
4 Verify that manual transfer warnings are attached and visible
5 Verify tightness of all control connections
6 Install all bolted electrical connections for high resistance using one or more of the following methods:Ohm meter low resistance ______ Torque
7 Perform manual transfer operation
8 Verify positive mechanical interlocking between normal and alternative sources
9 Clean unit prior to testing unless as-found and as-left test are required

Suba el Protocolo Terminado


Descargar Protocolo a Completar

link

Etapa C

NO. Items to be Checked OK N/A Punch List
1 Compare nameplate data with drawings and specifications
2 Inspect anchorage, alignment, grounding, and required
3 Verify / Utilized correct app. of manufacturer’s recommended
4 Verify that manual transfer warnings are attached and visible
5 Verify tightness of all control connections
6 Install all bolted electrical connections for high resistance using one or more of the following methods:Ohm meter low resistance ______ Torque
7 Perform manual transfer operation
8 Verify positive mechanical interlocking between normal and alternative sources
9 Clean unit prior to testing unless as-found and as-left test are required

Suba el Protocolo Terminado


Descargar Protocolo a Completar

link